南水北调中线穿黄工程二次衬砌预应力环形张拉施工技术
蒋元勇
Technology for Circular Prestress Tensioning of Secondary Lining of Tunnels: Case Study on Yellow Rivercrossing Tunnel on Central Route of Southtonorth Water Transfer Project
JIANG Yuanyong
隧道建设
.
2013, (4): 305
-308
.
DOI: 10.3973/j.issn.1672-741X.2013.04.009