武汉首例矩形顶管地铁出入口施工监测及数值模拟分析
陈聪,郑新定,陈扬勋,王超,钟世华,贺斌
Construction Monitoring and Numerical Simulation Analysis of the First Metro Entrance/exit Tunnel Constructed by Rectangular Pipe Jacking Method in Wuhan
CHEN Cong, ZHENG Xinding, CHEN Yangxun, WANG Chao, ZHONG Shihua, HE Bin
隧道建设
.
2013, (5): 354
-361
.
DOI: 103973/jissn1672-741X201305004