北京地铁8号线安—安区间明挖盾构始发井快速提供始发条件技术探讨
袁创辉,姜娜,李立
Optimization of Construction Program of Shield Launching Shaft to Achieve Earlier Shield Launching: Case Study on Shield Launching Shaft of Anhuaqiao Station Andelibeijie Station Section of Line 8 of Beijing Metro
YUAN Chuanghui, JIANG Na, LI Li
隧道建设
.
2013, (12): 1029
-1035
.
DOI: 10.3973/j.issn.1672-741X.2013.12.009