北京地铁8号线鼓楼大街站—什刹海站区间盾构冬季下穿平瓦房区分体始发施工技术
王刚
Separate Launching of Shield to Bore underneath Sensitive Buildings in Winter:Case Study on Shield Launching for Guloudajie StationShichahai Station Section on Line 8 of Beijing Metro
WANG Gang
隧道建设
.
2013, (12): 1041
-1047
.
DOI: 10.3973/j.issn.1672-741X.2013.12.011