北京地铁8号线南锣鼓巷站上下重叠隧道上线盾构始发中板加固技术
王刚
Consolidation of Intermediate Slab of Metro Station to Ensure Successful Construction of Stacked Tunnel: Case Study on Nanluoguxiang Station of Line 8 of Beijing Metro
WANG Gang
隧道建设
.
2013, (12): 1059
-1063
.
DOI: 10.3973/j.issn.1672-741X.2013.12.014