南水北调穿黄隧洞有粘结环锚预应力施工重难点分析
孙振川, 仲生星
Key Points in Implementation of Bonded Circumferential Prestressing of Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project
SUN Zhenchuan, ZHONG Shengxing
隧道建设
.
2014, (1): 73
-77
.
DOI: 10.3973/j.issn.1672-741X.2014.01.012