长春地铁1号线解放大路站一次扣拱暗挖逆作法施工地表沉降分析与控制
李春奎
Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch
LI Chunkui
隧道建设
.
2014, (3): 264
-268
.
DOI: 10.3973/j.issn.1672-741X.2014.03.014