• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
长春地铁1号线解放大路站一次扣拱暗挖逆作法施工地表沉降分析与控制
李春奎
Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch
LI Chunkui
隧道建设 . 2014, (3): 264 -268 .  DOI: 10.3973/j.issn.1672-741X.2014.03.014