重庆轨道交通6号线大龙山站—花卉园站区间中厚水平层状岩小净距重叠隧道爆破开挖时序探讨
蔡振宇, 黄旭
Discussion on Blasting Excavation Sequence of Closelyspaced Stacked Tunnels in Mediumthick Layered Rocks: Case Study on Dalongshan Huahuiyuan Running Tunnel on Line 6 of Chongqing Metro
CAI Zhenyu, HUANG Xu
隧道建设
.
2014, (5): 478
-483
.
DOI: 10.3973/j.issn.1672-741X.2014.05.013