深圳地铁盾构穿越建筑群及切削桩基施工
孙波, 肖龙鸽, 孙正阳, 殷明伦, 罗泽华
Shield Boring Underneath Buildings by Cutting Existing Foundation Piles: Case Study on Running Tunnel from Grand Theatre Station toLudan Village Station on Line 9 of Shenzhen Metro
SUN Bo, XIAO Longge, SUN Zhengyang, YIN Minglun, LUO Zehua
隧道建设
.
2015, (6): 571
-578
.
DOI: 10.3973/j.issn.1672-741X.2015.06.013