暗挖隧道下穿跨河桥部分桥桩的影响分析及对策——以北京地铁14号线北工大站—平乐园站区间为例
张晓光, 剧亮, 李菲
Analysis on and Countermeasures for Mining Tunneling of Line 14 of Beijing Metro Crossing Underneath Existing Bridge Piles
ZHANG Xiaoguang, JU Liang, LI Fei
隧道建设
.
2015, (7): 692
-697
.
DOI: 10.3973/j.issn.1672-741X.2015.07.013