深圳地铁11号线车公庙综合交通枢纽工程两相邻基坑开挖对下卧运营隧道的影响
丁加亮, 陈江, 余富先, 唐贤海
Effect of Foundation Pit Excavation on Existing Underlying Tunnel: Case Study on Chegongmiao Comprehensive Transportation Hub on Line 11 of Shenzhen Metro
DING Jialiang, CHEN Jiang, YU Fuxian, TANG Xianhai
隧道建设
.
2015, (9): 867
-872
.
DOI: 10.3973/j.issn.1672-741X.2015.09.002