长沙—株洲—湘潭城际铁路湘江隧道开滨盾构区间富水基岩地层管片背后注浆技术研究
任成国
Backfilling Grouting Technology for Shieldbored Tunnel in Waterrich Bedrock Strata: Case Study on Xiangjiang Tunnel on ChangshaZhuzhouXiangtan Intercity Railway
REN Chengguo
隧道建设
.
2015, (9): 935
-938
.
DOI: 10.3973/j.issn.1672-741X.2015.09.012