沈阳地铁暗挖区间竖井及横通道穿越建筑及生活垃圾填埋层综合施工技术
王吉华
Comprehensive Construction Technologies for Vertical Shaft and Horizontal Adit of A Mined Tunnel of Shenyang Metro Crossing Underneath Garbagepacked Layer
WANG Jihua
隧道建设
.
2016, (5): 606
-613
.
DOI: 10.3973/j.issn.1672-741X.2016.05.017