• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
盾构慢速掘进(停机)沉降影响因素及控制措施探讨
郭幪
Influencing Factors and Control Technologies for Ground Surface Settlement  Induced by Shield Tunneling When Shield Bores Slowly/Shield Stop
GUO Meng
隧道建设 . 2016, (6): 701 -709 .  DOI: 10.3973/j.issn.1672-741X.2016.06.008