天津地铁6号线西青道站—南运河站区间盾构到达接收措施失效处理实例
李海, 朱长松
Countermeasures for Failure of Shield Receiving of Xiqingdao StationNanyunhe Station Section on Line No. 6 of Tianjin Metro
LI Hai, ZHU Changsong
隧道建设
.
2016, (12): 1512
-1516
.
DOI: 10.3973/j.issn.1672-741X.2016.12.016