• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
砂卵石地层泥水盾构施工技术难点及控制措施分析——以兰州地铁穿黄隧道工程为例
霍滨, 徐朝辉, 胡相龙, 郭贵斌
Analysis of Technical Difficulties and Control Measures for Slurry Shield Boring in Sandy Cobble Strata: A Case Study of Yellow Rivercorssing Tunnel of Lanzhou Metro
HUO Bin, XU Zhaohui, HU Xianglong, GUO Guibin
隧道建设 . 2018, (5): 846 -850 .  DOI: 10.3973/j.issn.2096-4498.2018.05.019