基坑开挖引起复合地基下方既有双线地铁隧道位移的计算方法
卜康正, 郑先昌, 张万照, 郭劲睿, 沈翔
Calculation Method for Displacement of Existing Doubletube Metro Tunnel under Composite Foundation Induced by Foundation Pit Excavation
BU Kangzheng, ZHENG Xianchang, ZHANG Wanzhao, GUO Jinrui, SHEN Xiang
隧道建设
.
2019, (5): 783
-794
.
DOI: 10.3973/j.issn.2096-4498.2019.05.010