基于AM桩盖挖逆作地铁车站施工力学有限元分析
张振义, 陈雾航, 许有俊, 李文博
Finite Element Mechanical Analysis of Metro Station Constructed by Cut and Cover TopDown Method Based on AM Pile
ZHANG Zhenyi, CHEN Wuhang, XU Youjun, LI Wenbo
隧道建设
.
2020, (2): 189
-194
.
DOI: 10.3973/j.issn.2096-4498.2020.02.005