“ 坑中坑” 盾构吊出井施工技术 ———以广州市深层隧道排水系统东濠涌试验段为例
刁志刚, 陈钦东, 王智勇
Construction Technology of Shield Hoisting Shaft of Foundation Pit in Pit: a Case Study on Donghaochong Test Section of Guangzhou Deep Tunnel Drainage System
DIAO Zhigang, CHEN Qindong, WANG Zhiyong
隧道建设
.
2019, (S2): 335
-344
.
DOI: 10.3973/j.issn.2096-4498.2019.S2.042