盖挖逆作地铁车站明暗双牛腿结构抗剪性能研究
张林, 吴云
Investigation into Shearing Capacity of VisibleConcealed
Twincorbel Used in a Metro
Station Excavated by CutandCover
TopDown Method
ZHANG Lin, WU Yun
隧道建设
.
2020, (9): 1285
-1291
.
DOI: 10.3973/j.issn.2096-4498.2020.09.006