超大断面暗挖洞室临时支撑拆除及二次衬砌结构快速施工技术——以深圳地铁8号线深外站为例
王帅帅, 蔡唐涛, 伍春, 许前顺, 高波
Demolition of Temporary Support and Rapid Construction
Technology of Secondary Lining Structure in Super Large Crosssection Mined Cavern: a Case Study on
Shenzhen Foreign Languages School Station on Shenzhen
Metro Line 8
WANG Shuaishuai, CAI Tangtao, WU Chun, XU Qianshun, GAO Bo
隧道建设
.
2020, (10): 1525
-1532
.
DOI: 10.3973/j.issn.2096-4498.2020.10.017