敞开式顶管机改造及洞内组装升级泥水平衡顶管机施工技术——以深圳电网北环110 kV架空线改造入地电缆隧道工程为例
董志伟, 丁小彬, 杨永强, 张超
Transformation, Assembling and Construction Technology
of Open Pipe Jacking Machine to Slurry Balanced Pipe Jacking
Machine in Tunnel:
a Case Study on Shenzhen 110 kV Overhead Line
Transformation
into
Ground Cable Tunnel Project
DONG Zhiwei, DING Xiaobin, YANG Yongqiang, ZHANG Chao
隧道建设
.
2020, (11): 1649
-1656
.
DOI: 10.3973/j.issn.2096-4498.2020.11.014