机械法联络通道T接施工地层隆沉变化特征研究——以无锡地铁3号线顶管法联络通道T接施工示范工程为例
卫佳莺, 马永政, 莫振泽, 郦亮, 靳永福, 丁謇
Study on influence of ground settlement in Tjoint
connecting passage with mechanical Pipe Jacking method: With the example
of the
demonstration project of Tjoint
construction of connecting
passage
with pipe jacking method in Wuxi Metro Line 3
WEI Jiaying, MA Yongzheng, MO Zhenze, LI Liang, JIN Yongfu, DING Jian
隧道建设
.
2020, (S2): 136
-143
.
DOI: 10.3973/j.issn.2096-4498.2020.S2.018