基于BIM的地铁站后工程管线安装进度自动采集及智能管控方法
许有俊, 李德功, 孙红斌
BIMBased Automatic Acquisition and
Intelligent Control Method for Pipeline
Installation Schedule for Auxiliary Works of Subway Station
XU Youjun, LI Degong, SUN Hongbin
隧道建设
.
2021, (S1): 375
-
.
DOI: 10.3973/j.issn.2096-4498.2021.S1.048