Establishment and Application of "1 km+100 m+50 m" Geological Prediction System for ExtraLong TBM Tunnels:  a Case Study on Water Supply Project  in Xinjiang, China(超特长隧洞TBM施工“115”超前地质预报系统创建与实践——以北疆供水二期工程为例)

邓铭江, 许振浩, 刘斌
Establishment and Application of "1 km+100 m+50 m" Geological Prediction System for ExtraLong TBM Tunnels:  a Case Study on Water Supply Project in Xinjiang, China
DENG Mingjiang, XU Zhenhao, LIU Bin
隧道建设 . 2021, (9): 1433 -1450 .  DOI: 10.3973/j.issn.2096-4498.2021.09.001