复合岩层隧道下穿既有建筑TBM施工关键技术——以重庆轨道9号线中从区间隧道为例
王赟
Key Construction Technology of Tunnel Boring Machine
Crossing underneath Existing Building in Composite Rock
Strata: a Case Study of Central Park East StationCongyansi Station on Chongqing Rail Transit Line 9
WANG Yun
隧道建设
.
2021, (S2): 520
-526
.
DOI: 10.3973/j.issn.2096-4498.2021.S2.066