无中导洞连拱隧道后行洞爆破方案优化研究——以新民隧道为例
张伟, 王少飞, 喻佳, 白宏达
Optimization of Blasting Scheme for Rear Tunnel of
MultiArch Tunnel Without Middle Pilot Heading: a
Case Study of Xinmin Tunnel
ZHANG Wei, WANG Shaofei, YU Jia, BAI Hongda
隧道建设
.
2022, (S2): 412
-420
.
DOI: 10.3973/j.issn.2096-4498.2022.S2.051