高温、高湿环境下隧道喷射混凝土裂缝控制研究——以阿联酋铁路二期D标T1隧道为例
吕锋, 王文正, 周志华, 刘大刚, 江峰清, 罗佳
Crack Control of Tunnel Shotcrete in High Temperature
and Humidity Environment: A Case Study of T1 Tunnel of Bid D
Section of Phase 2 of UAE Railway
LYU Feng, WANG Wenzheng, ZHOU Zhihua, LIU Dagang, JIANG Fengqing, LUO Jia
隧道建设
.
2023, (S2): 208
-214
.
DOI: 10.3973/j.issn.2096-4498.2023.S2.023