废弃岩渣壁后注浆体固结时变性及对地层沉降影响研究——以南京和燕路过江通道盾构隧道工程为例
袁锐, 赵小鹏, 李鹏飞, 李震, 闵凡路
TimeVarying Consolidation of Grout
Prepared by Waste Rock Slag for Grouting Behind Lining and Its Influence on Ground Settlement:
A Case Study of Heyan
Road Yangtze RiverCrossing Shield Tunnel in Nanjing,
China
YUAN Rui, ZHAO Xiaopeng, LI Pengfei, LI Zhen, MIN Fanlu
隧道建设
.
2024, (4): 762
-770
.
DOI: 10.3973/j.issn.2096-4498.2024.04.014