Case Study on "Shield Boring+Segment Erection" Synchronization Technology in Tunneling by Super-Large Diameter Slurry Balanced Shield(超大直径泥水平衡盾构推拼同步技术工程实践)
朱叶艇, 朱雁飞, 秦元, 赵剑, 王志华, 龚卫
Case Study on "Shield
Boring+Segment Erection" Synchronization Technology in Tunneling by Super-Large Diameter Slurry
Balanced Shield
ZHU Yeting, ZHU Yanfei, QIN Yuan, ZHAO Jian, WANG Zhihua, GONG Wei
隧道建设
.
2024, (11): 2271
-2282
.
DOI: 10.3973/j.issn.2096-4498.2024.11.017