• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码

永临一体装配式地下连续墙预制及安装施工技术研究——以深圳地铁8号线三期溪涌站项目为例

韩胜

Prefabrication and Installation Technology of Permanent and Temporary Integrated Prefabricated Diaphragm Wall: A Case of Xichong Station of Shenzhen Metro Line 8 Phase Ⅲ

HAN Sheng
隧道建设 . 2025, (S1): 260 -269 .  DOI: 10.3973/j.issn.2096-4498.2025.S1.026