洞桩法地铁车站先隧后站施工时序交互影响与变形控制
冯冀蒙, 李艺飞, 姚仕钰, 王圣涛, 张俊儒, 孙宁
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning
隧道建设
.
2026, (1): 183
-193
.
DOI: 10.3973/j.issn.2096-4498.2026.01.015