基于LCA的浅覆土综合管廊U型盾构与明挖施工碳排放及环境影响对比——以雄安新区EA4标段工程为例
张洪军, 赵家伟, 王树旺, 宋战平, 徐宏, 董志伟, 户若琪
Comparative Life Cycle Assessment of Carbon Emissions and Environmental Impacts From U-Shaped Shield Tunneling and Cut-and-Cover Construction of Shallow-Buried Utility Tunnels: A Case Study of EA4 Bid Section Project in Xiong’an New Area
ZHANG Hongjun, ZHAO Jiawei, WANG Shuwang, SONG Zhanping, XU Hong, DONG Zhiwei, HU Ruoqi
隧道建设
.
2026, (9): 1885
-1903
.
DOI: 10.3973/j.issn.2096-4498.2026.09.006