盾构隧道“推-拼-运-管”一体化人机协同智能建造——以上海地铁13号线区间工程为例
朱叶艇, 裴烈烽, 朱雁飞, 吴惠明, 龚卫, 黄圣, 潘伟强, 黄德中
Human-Machine Collaborative Intelligent Construction Integrating Shield Driving, Segment Assembly, Material Logistics, and Project Management: A Case Study of Shanghai Metro Line 13 Section
ZHU Yeting, PEI Liefeng, ZHU Yanfei, WU Huiming, GONG Wei, HUANG Sheng, PAN Weiqiang, HUANG Dezhong
隧道建设
.
2026, (10): 2226
-2239
.
DOI: 10.3973/j.issn.2096-4498.2026.10.013