厦门机场路JC3标梧村山浅埋大跨连拱隧道沉降控制对策
梁超
Settlement Control Countermeasures for Shallowlyburied Doublearch
Tunnels with Large Spans: Case Study on Wucunshan Tunnel on JC3
Bid Section of Airport Highway in Xiamen, China
LIANG Chao
隧道建设
.
2007, (4): 79
-81,84
.
DOI: B