• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2017, Vol. 37 ›› Issue (7): 845-850.DOI: 10.3973/j.issn.1672-741X.2017.07.010

• 施工技术 • 上一篇    下一篇

天目山隧道施工废水特征分析及处理

刘伟1, 付海陆2,*, 耿伟1, 庞伟1, 曾爱斌3, 官宝红4   

  1. (1. 中铁隧道集团有限公司杭州公司, 浙江杭州 310030; 2. 中国计量大学, 浙江杭州 310018; 3. 杭州万向职业技术学院, 浙江杭州 310023; 4. 浙江大学, 浙江杭州 310058)
  • 收稿日期:2017-03-17 修回日期:2017-06-09 出版日期:2017-07-20 发布日期:2017-07-26
  • 作者简介:刘伟(1972—),男,浙江杭州人,1994年毕业于西南交通大学,铁路工程专业,本科,高级工程师,从事隧道及地下工程施工管理工作。Email: 258626748@qq.com。 *通讯作者: 付海陆, Email: hlfu@cjlu.edu.cn。

Characteristic Analysis and Treatment of Construction Wastewater of Tianmushan Tunnel

LIU Wei1, FU Hailu2,*, GENG Wei1, PANG Wei1, ZENG Aibin3, GUAN Baohong4   

  1. (1. Hangzhou Branch of China Railway Tunnel Group Co., Ltd., Hangzhou 310030, Zhejiang, China; 2. China Jiliang University, Hangzhou 310018, Zhejiang, China; 3. Hangzhou Wanxiang Polytechnic, Hangzhou 310023, Zhejiang, China; 4. Zhejiang University, Hangzhou 310058, Zhejiang, China)
  • Received:2017-03-17 Revised:2017-06-09 Online:2017-07-20 Published:2017-07-26

摘要:

天目山隧道进口段毗邻“新安江—富春江—千岛湖”国家级风景名胜区,为避免隧道施工废水影响当地生态环境和饮水安全,对其特征进行分析,发现废水中悬浮物(SS)和酸碱度(pH)超标,且含有重金属。部分水样中汞(Hg)和镍(Ni)超标(其中Hg的超标频次较高),其他重金属未超标,废水中出现重金属与地质有关。采用“初沉+混凝+沉淀+过滤”工艺处理废水,初沉主要去除大颗粒悬浮物,混凝、沉淀主要去除细颗粒物和重金属。结果表明: 处理后的废水各指标均满足排放要求,处理成本为0.51元/m3,经济性较好。

关键词: 天目山隧道, 隧道施工废水, 废水处理, 重金属

Abstract:

The entrance of Tianmushan Tunnel is adjacent to the national scenic area of “Xin’an RiverFuchun RiverQiandao Lake”. The protection of the safety of local ecological environment and drinking water is very important. As a result, the characteristics of construction wastewater of Tinmushan Tunnel are analyzed; the results show that the suspended solids (SS) and power of hydrogen (pH) in wastewater exceed the limit. The heavy metals related to the engineering geology are detected in the wastewater, which do not exceed the limit except mercury (Hg) and nickel (Ni) in some of water samples. The wastewater treatment method of “primary setting + coagulation + sediment + filtration” is adopted. The suspended solids with large particle size can be removed by primary setting process; and the fine particulate matter and the heavy metals can be removed by coagulation and sediment process. The application results show that the quality of construction wastewater after treatment can meet relevant requirements; meanwhile, the treatment cost of the wastewater per cubic meter is RMB 0.51, so as to show beffer economical benefit.

Key words: Tianmushan Tunnel, tunnel construction wastewater, wastewater treatment, heavy metal

中图分类号: