摘要:
为检测隧道通风系统的通风效果,掌握通风设备的基本情况,为后期通风系统优化和调整提供正确的设计参数,对甘姆奇克铁路隧道进口工区进行通风系统测试及隧道内作业环境检测。检测及测试结果表明甘姆奇克隧道进口工区系统维护较好,通风效果良好。
关键词: 甘姆奇克隧道, 施工通风, 通风系统, 作业环境, 测试
Abstract:
The experiment and test are carried out for ventilation system at entrance section and working environment of Qamchiq Railway Tunnel so as to test the ventilation effect of ventilation system, learn the basic knowledge of ventilation equipments and provide correct design parameters for optimization and adjustment of ventilation system. The results show that the ventilation effect and ventilation system maintenance at entrance section of Qamchiq Tunnel are good.
Key words: Qamchiq Tunnel, construction ventilation, ventilation system, working environment, experiment
中图分类号:
U 45
张忠爱, 熊文安, 敬桂蓉. 甘姆奇克隧道施工通风测试研究[J]. 隧道建设, 2017, 37(8): 958-965.
ZHANG Zhongai, XIONG Wenan, JING Guirong. Experimental Study of Construction Ventilation of Qamchiq Tunnel on AngrenPop Railway in Uzbekistan[J]. Tunnel Construction, 2017, 37(8): 958-965.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/10.3973/j.issn.1672-741X.2017.08.007
http://www.suidaojs.com/CN/Y2017/V37/I8/958