隧道建设(中英文) ›› 2020, Vol. 40 ›› Issue (7): 1011-1016.DOI: 10.3973/j.issn.2096-4498.2020.07.010

• 规划与设计 • 上一篇    下一篇

设置小交路的T型地铁换乘站方案研究

张彤松   

  1. (中铁城市发展投资集团有限公司, 四川成都 610000
  • 出版日期:2020-07-20 发布日期:2020-07-29
  • 作者简介:张彤松(1963—),男,天津人,1993年毕业于北方交通大学,铁道运输专业,本科,高级工程师,从事城市轨道交通建设管理工作。E-mail: Shensishulv@163.com。

Study on Scheme of Tshaped Metro Transfer Station with Part Route

ZHANG Tongsong   

  1. (China Railway City Development and Investment Group, Co., Ltd., Chengdu 610000, Sichuan, China)
  • Online:2020-07-20 Published:2020-07-29

摘要: 城市核心区的地铁换乘站一般位于繁华地带,车站规模较大、附属建筑较多,且受到线路32区间方案的制约,车站方案设计复杂。如果换乘站的其中1条线路设置了小交路,则车站方案设计难度进一步加大,小交路清客的瞬时集中客流与进站、候车、换乘客流形成对冲,增加客流组织难度。以常规的2线十字交叉换乘站为例,通过分析清客过程中的4种工况,采用静态计算方式分析清客状态下的侧站台占用宽度。研究结果表明: 考虑小交路时,采用静态计算的站台宽度较正常情况大,同时,由于客流对冲形成的客流无序状态将进一步加剧侧站台的压力。最后结合案例分析,提出加宽侧站台和增加1个侧站台2种方案,并建议尽量避免将小交路设置在客流量较大的换乘车站。

关键词: 小交路, 地铁换乘站, 客流流线, 侧站台, 静态计算

Abstract: The metro transfer stations of urban core area are always located in bustling area with large scale and multiple auxiliary buildings. Restricted by the scheme of threestation and twosection, the station design scheme is complex; when the part route scheme is adopted, the scheme design difficulty increases; and the instantaneous centralized passenger flow of the part route will be offset with the passenger flow of arrival, waiting and transfer, which will increase the difficulty of passenger flow organization. Taking the doubleline cross transfer station for example, analysis is made on 4 working conditions in the process of passenger clearing, and the occupied width of side platform in the passenger clearing state is analyzed by static calculation. The research results show that: (1) When considering part route, the static calculated platform width is significantly larger than conventional situation. (2) The passenger flow disorder caused by the passenger flow hedging will further aggravate the pressure on the side platform. It is put forward that widening the platform or adding one side platform, and setting the part route at the area with small passenger flow can help to improve the scheme effect.

Key words: part route, metro transfer station, passenger flow line, side platform, static calculation