隧道建设(中英文) ›› 2020, Vol. 40 ›› Issue (7): 1049-1056.DOI: 10.3973/j.issn.2096-4498.2020.07.015

• 施工技术 • 上一篇    下一篇

水下盾构隧道管片钻穿引起的涌水突泥治理技术研究

韩贇1, 2   

  1. 1. 陕西省铁道及地下交通工程重点实验室(中铁一院), 陕西 西安 710043;2. 轨道交通工程信息化国家重点实验室(中铁一院), 陕西 西安 710043
  • 出版日期:2020-07-20 发布日期:2020-07-30
  • 作者简介:韩贇(1987—),男,陕西西安人,2013年毕业于北京交通大学,地下工程专业,硕士,工程师,主要从事城市轨道交通与隧道设计研究工作。E-mail: 573518656@qq.com。

Study on Treatment Technology of Water Gushing and Mud Bursting Caused by Segment Drilling of Underwater Shield Tunnel

HAN Yun1, 2   

  1. 1. Shaanxi Railway and Underground Traffic Engineering Key Laboratory (FSDI), Xian 710043, Shaanxi, China; 2. State Key Laboratory of Rail Transit Engineering Informatization (FSDI), Xian 710043, Shaanxi, China
  • Online:2020-07-20 Published:2020-07-30

摘要: 水下盾构隧道管片钻穿会引起大量涌水突泥,对隧道建设及运营造成重大影响,且采取的隧道修复措施将影响隧道的长期运营安全。以某地铁隧道被意外钻穿的实例为工程背景,为确保水下隧道意外钻穿破坏时,可以做到临时封堵有效,永久修复满足百年使用要求,提出修复思路。在水面利用浮船进行海上袋装水泥封堵,然后筑岛截断隧道与海水的联系; 临时封堵后监测管片变形、复核隧道中线,明确钻孔对隧道限界的影响; 通过计算对结构安全性进行评价,明确钻孔对管片结构受力影响较小。在确保隧道钻穿对隧道限界及结构的影响可控后,采取地面注浆、洞内注浆、倒锥形封堵、洞内设置内撑钢板相结合的方案,对隧道钻穿处进行治理,保证隧道的安全运营。在隧道周边施工时,应加强隧道保护意识,避免对既有隧道造成破坏。

关键词: 水下盾构隧道, 管片破坏, 涌水突泥, 变形监测, 中线复核, 结构安全性评价, 管片修复, 倒锥形封堵

Abstract: The accidental drilling of underwater shield tunnel will produce a large amount of gushing water and mud, which will significantly affect the construction and operation of the tunnel, and the repair measures will affect the longterm operation safety of the tunnel. When accidental drilling damage occurs to the underwater tunnel, effective temporary blocking and sealing should be carried, and the one hundredyear operation of tunnel after repairing should be guaranteed. As a result, the repairing idea is put forward. Firstly, the floating ship is used to carry out cement sealing, and the isolation island is built to cut off the connection between the tunnel and the sea water. And then the deformation monitoring on segment and recheck of tunnel central line are carried out after temporary sealing, and the influence of the drilling hole on the tunnel boundary is clarified. The structural safety is evaluated by calculation, and the evaluation results show that the drilling hole has little influence on the segment structure. Finally, the scheme of ground grouting, inhole grouting, inverted cone sealing and inhole bracing steel plate is adopted to repair the tunnel drilling position and ensure the safe operation of the tunnel. In addition, the tunnel protection should be paid attention to when carrying out relevant treatments.

Key words: underwater shield tunnel, segment damage, water gushing and mud bursting, deformation monitoring, center line recheck; structural safety evaluation, segment repair, inverted cone sealing