陡倾岩层双洞四线大跨暗挖地铁车站合理净距研究

代坤   

  1. (中铁第六勘察设计院集团有限公司, 天津 300308)
  • 出版日期:2021-07-30 发布日期:2021-08-29
  • 作者简介:代坤(1984—),男,湖南长沙人,2009年毕业于兰州交通大学,岩土与地下工程专业,硕士,高级工程师,现从事地下工程结构设计工作。E-mail: 48009494@qq.com。
  • 基金资助:
    重庆市建设科技计划项目(2017-1-1-4

Reasonable Clear Spacing for Large-Span Twin Tube Four Track  Underground Metro Station in Steep Dip Rocks

DAI Kun   

  1. (China Railway Liuyuan Group Co., Ltd., Tianjin 300308, China)
  • Online:2021-07-30 Published:2021-08-29

摘要: 当隧道轴线平行于陡倾岩层走向时,围岩开挖失稳风险随开挖跨度变大和隧道净距减小而显著升高,制定大跨度隧道在陡倾岩层中的合理净距对工程安全非常重要。以重庆轨道交通环线双洞四线大跨涂山站暗挖隧道为背景,对隧道轴线与陡倾岩层走向接近平行条件下采用双侧壁导坑法施工的2个超大跨近距离隧道,采用地质几何分析工程类比的方法,提出包含岩层破裂角θ的几何理论公式和最小隧道净间距计算方法,并结合数值模拟和施工试验段的监测反馈数据分析,确定地质偏压状态下近距离超大断面隧道的合理净距。结果表明: 在隧道轴线与陡倾岩层走向接近平行状态下的近距离大跨隧道设计中结合岩层倾角考虑,将内侧隧道置于外侧隧道滑裂面之外,并由此推算出两隧道净距的方法是安全可靠的。

关键词: 大跨暗挖隧道, 小净距隧道, 合理净距, 陡倾角岩层, 围岩稳定分析

Abstract: When the tunnel axis parallels to the trend of steep rock formation, the instability risk of the surrounding rock caused by excavation increases with the increasing excavation span and the decreasing tunnel clear spacing. Accordingly, the reasonable determination of clear spacing for largespan tunnel in steep rock formation is of great significance. A case study is conducted on twintube fourtrack mined Tushan station tunnel of Chongqing rail transit ring line. Then tunnel axis is parallel to trend of steep rock formation, and the two superlarge small clearspacing tunnels are constructed by doubleside drift method. The geometric theory formula that includes a rock fracture angle of θ and the calculation method of minimum tunnel spacing are proposed using the methods of geogeometric analysis and engineering analogies. Then, the reasonable clear spacing of superlarge crosssection tunnels under asymmetrical geological pressure is determined by analyzing the numerical simulation and the monitoring and feedback data of the construction test section. The results show that the clear spacing calculated by setting inside tunnel outside the sliding surface of lateral tunnel is safe and feasible when the tunnel axis is parallel to the trend of steep rock formation.

Key words: large-span mined tunnel, small clear-spacing, reasonable clear spacing, steep dip rocks, surrounding rock stability analysis