隧道建设(中英文) ›› 2022, Vol. 42 ›› Issue (3): 414-419.DOI: 10.3973/j.issn.2096-4498.2022.03.009

• 研究与探索 • 上一篇    下一篇

装配式车站出入口环框预制结构沿车站纵向的受力分析

吴成刚, 罗杰俊, 林放   

  1. (北京城建设计发展集团股份有限公司, 北京 137000
  • 出版日期:2022-03-20 发布日期:2022-04-03
  • 作者简介:吴成刚(1983—),男,四川大竹人,2009年毕业于西南交通大学,桥梁与隧道工程专业,硕士,高级工程师,现从事地下结构设计与研究工作。E-mail: 187249822@qq.com。
  • 基金资助:

     住建部研究开发项目(2020-K-141); 国家重点研发计划(2017YFB1201104)

Stress Analysis of Prefabricated Structure of Entrance and Exit Ring Frame along Longitudinal Direction of Station

WU Chenggang, LUO Jiejun, LIN Fang   

  1. (Beijing Urban Construction Design and Development Group Co., Ltd., Beijing 137000, China)
  • Online:2022-03-20 Published:2022-04-03

摘要: 为研究装配式车站出入口环框预制结构受力,给出入口环框设计提供理论基础,首先,分析装配式车站预制环框从施工到使用各阶段不同的荷载模式。其次,采用有限元计算方法,研究环框结构从施工安装阶段、覆土回填阶段到出入口施作完成阶段的受力特点。然后,指出预制环框结构同顶板结构之间凹凸榫槽在完成接缝注浆后,沿车站纵向形成整体,对环框受力较为有利;同时,预制环框结构与顶板形成整体后共同抵抗覆土阶段及长期使用阶段的各项荷载,可以满足装配式车站拼装施工要求及后期车站结构整体受力要求。最后,提供一种设置临时钢支撑的安全储备措施,并对其结构受力进行验算,确保出入口环连续拼装的安全可靠。

关键词: 装配式车站, 出入口环框预制构件, 结构力学特性, 荷载模式, 有限元计算方法, 增量法

Abstract: To study the prefabricated structure force of the assembled station entrance ring frame and develop a theoretical foundation for the design of the entrance and exit ring frame, the load modes of the prefabricated ring frame of a prefabricated station are analyzed from construction to usage. The stress properties of the ring frame structure are examined utilizing the finite element method from the construction and installation stage to the backfilling stage toward the completion stage of the entrance and exit. Furthermore, it is observed that after joint grouting, the concave and convex tenon grooves between the prefabricated ring frame structure and roof structure generates a whole along longitudinal direction of the station, which is beneficial to the ring frames′ stress. Meanwhile, in the soil covering stage and longterm usage stage, the prefabricated ring frame structure and roof generate a whole to collectively resist the various loads, which can meet the requirements of the assembled station construction and the overall force requirements of the station structure in advanced stages. Finally, a safety reserve method is provided for constructing temporary steel support, and the structural stress is examined to ensure the safety and reliability of the continuous assembly of the entrance and exit rings.

Key words: prefabricated station, prefabricated structure of entrance and exit ring frames, structural mechanical properties, loadpattern, finite element method, increment method

中图分类号: