隧道建设(中英文) ›› 2022, Vol. 42 ›› Issue (S1): 433-441.DOI: 10.3973/j.issn.2096-4498.2022.S1.051

• 施工技术 • 上一篇    下一篇

特长隧道“一洞双机”TBM高效掘进关键技术及应用

文斌   

  1. (中铁隧道股份有限公司, 河南 郑州 450001
  • 出版日期:2022-07-22 发布日期:2022-08-23

Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines

WEN Bin   

  1. (China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001, Henan, China)
  • Online:2022-07-22 Published:2022-08-23

摘要: 为降低特长隧道“一洞双机”模式下2TBM同时施工的相互干扰,实现2TBM协同、高效、快速施工,以北疆供水二期工程某标段为背景,针对TBM组装洞结构形式、皮带机出渣、有轨运输、隧洞施工排水等方面,基于“独立运行、统一管理”的思路,形成“一洞双机”TBM高效施工关键技术: 1TBM组装洞结构优化关键技术; 2)双向多级皮带机出渣关键技术; 3)综合互通型有轨运输关键技术; 4)汇流式梯级抽排水关键技术。从应用效果来看,优化后组装洞结构形式合理,满足2TBM同步组装的需要,并有助于实现皮带机、有轨运输、施工排水等关键技术系统的建立。在掘进施工阶段,各系统运行良好,有效应对了“一洞双机”模式下2TBM施工干扰大、效率低等问题,实现了2TBM的长期稳产、高产。

关键词: 特长隧道, 敞开式TBM, “一洞双机”, 辅助洞室, 双向多级皮带机出渣, 互通型有轨运输, 汇流式梯级抽排水

Abstract:  To reduce the interaction of the two tunnel boring machines(TBMs) in the extralong tunnels and further realize coordinated, highefficient, and rapid construction, a case study is conducted on a bid section of the North Xinjiang water supply phase project. Then the TBM assembly tunnel structure, belt conveyor mucking, track transportation, and tunnel drainage are analyzed. Finally, some key techniques for highefficient doubleTBM construction, including structural optimization of TBM assembly tunnel, doubledirectional multilevel belt conveyor mucking, comprehensive track transportation, and convergent cascade drainage, are formed based on the construction idea of independent operation and unified management. The application effect show that the optimized structure of the assembly tunnel is reasonable, which meets the needs of synchronous assembly of two TBMs and helps to realize the establishment of key technical systems such as belt conveyors, track transportation, and construction drainage. During tunneling stage, various systems operated well, and the expected goals have been achieved steadily.

Key words: extra long tunnel, open TBM, one tunnel bored by two TBMs, auxiliary tunnel, doubledirectional multilevel belt conveyor mucking, interchangeable rail transit, convergent cascade drainage