ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2005, Vol. 25 ›› Issue (5): 28-30,34.
• 规划与设计 • 上一篇 下一篇
姜庆滨
收稿日期:
出版日期:
发布日期:
作者简介:
JIANG Qiang-Bin
Received:
Online:
Published:
摘要:
通过对7381既有隧道测量及限界分析,初步确定了哈尔滨市轨道交通一期工程的车辆限界、线路技术参数等,对地铁建设节约投资、发挥更大的效益以及可行性研究和设计提供参考。
Abstract:
Through surveying of and gauge analysis on 7381 existing tunnel, the gauges of the trains and the technical parameters of the alignment of phase Ⅰ of the rail transit systems of Harbin city is preliminary determined, which can provide reference for costsaving and more efficiency achieving in the construction of the Metro systems and for the feasibility study and design of the Metro systems.
Key words: tunnel , survey , gauge , analysis preliminary , study
姜庆滨. 某既有隧道测量及限界分析与研究[J]. 隧道建设, 2005, 25(5): 28-30,34.
JIANG Qiang-Bin. nalysis |and |Study on |Gauge |Survey of An Existing |Tunnel[J]. Tunnel Construction, 2005, 25(5): 28-30,34.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/
http://www.suidaojs.com/CN/Y2005/V25/I5/28