隧道建设(中英文) ›› 2005, Vol. 25 ›› Issue (6): 32-34,41.
• 施工技术 • 上一篇 下一篇
董勤银
收稿日期:
出版日期:
发布日期:
作者简介:
DONG Qi-Yin
Received:
Online:
Published:
摘要:
介绍了乌鞘岭隧道7号斜井在施工期间发生突然涌水后的堵水注浆参数、泵站配置能力以及斜井拐弯避开涌水地段的措施,说明了治水效果,可供以后隧道施工中发生涌水治理的设计与施工参考。
Abstract:
This paper introduces the parameters of grouting to control the water inrush of No.7 inclined shaft of Wushaoling tunnel, the capacity determination of the pumping stations, the changing of the route of the inclined shaft to avoid the water inrush area, and the effects of the water inrush control, which can offer reference for the design and execution of water inrush control during tunnel construction.
董勤银. 乌鞘岭隧道7号斜井涌水治理措施[J]. 隧道建设, 2005, 25(6): 32-34,41.
DONG Qi-Yin. Countermeasures for Water Inflow into No. 7 Inclined Shaft of |Wushaoling Tunnel[J]. Tunnel Construction, 2005, 25(6): 32-34,41.