ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2006, Vol. 26 ›› Issue (5): 76-78.DOI: B
• 施工技术 • 上一篇 下一篇
奥海波, 范雄娃
收稿日期:
出版日期:
发布日期:
作者简介:
AO Hai-Bei, Fan-Xiong-Gui
Received:
Online:
Published:
摘要:
结合南京地铁许府巷、玄武门车站地下连续墙施工,介绍在保证吊装长大钢筋笼和接头桩的安全性、可靠性、使被吊物体不发生弹性变形和降低抗弯强度的情况下,选择起重设备、确定吊点位置、配备吊具,并介绍接头桩、钢筋笼的吊装过程及注意事项。
Abstract:
Taking the construction of the diaphragm walls in Xufuxiang station and Xuanwumen station of Nanjing Metro as example, the paper presents the selection of the hoisting equipment, the determination of the positions of the hoisting points and the allocation of the hoisting tools, in order to ensure the safety and reliability of the hoisting of the huge rebar cages and connection piles and to avoid elastic deformations and reduced bending strength of the hoisted rebars and connection piles. Furthermore, the paper presents the process of the hoisting of the connection piles and rebar cages and the issues to which attention should be paid during hoisting.
中图分类号:
TU476+.3
奥海波, 范雄娃. 地下连续墙钢筋笼、接头桩吊装技术[J]. 隧道建设, 2006, 26(5): 76-78.
AO Hai-Bei, Fan-Xiong-Gui. Rebar Cages and Connection Piles Hoisting Technology in Diaphragm Wall Construction[J]. Tunnel Construction, 2006, 26(5): 76-78.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2006/V26/I5/76