• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码

隧道建设(中英文) ›› 2008, Vol. 28 ›› Issue (1): 93-96.DOI: B

• 施工技术 • 上一篇    下一篇

TMS在隧道渐变段施工测量中的应用

张学强   

  1. 中国水利水电第一工程局官地水电站项目部
  • 收稿日期:2007-07-06 修回日期:2007-10-17 出版日期:2008-02-20 发布日期:2009-11-18
  • 作者简介:张学强(1972 - )|男|吉林长春市人|1994年毕业于黄河水利学校水利水电专业|专科|工程师|从事水利水电施工测量工作。

Application of TMS in Construction Survey of Tunnel Transition Sections

ZHANG Xueqiang   

  1. Project Management Department of Guandi Hydropower Works, Sinohydro No. 1
    Engineering Bureau
  • Received:2007-07-06 Revised:2007-10-17 Online:2008-02-20 Published:2009-11-18

摘要:

隧道渐变段的放样测量一般需按照设计方案进行一定复杂程度的内插计算,常规的作业模式在计算渐变段时会变得异常的复杂和烦琐。而TMS隧道测量系统以自动化的方式解决了这个问题。

Abstract:

 In general cases, the settingout survey of the tunnel transition sections needs some interpolation calculations made as per the designed plans, which are always very complex and contain much trivial details. The tunnel measurement system "TMS", however, provides an automatic solution for the issue.

中图分类号: