- 中国科学引文数据库(CSCD)来源期刊
- 中文核心期刊中文科技核心期刊
- Scopus RCCSE中国核心学术期刊
- 美国EBSCO数据库 俄罗斯《文摘杂志》
- 《日本科学技术振兴机构数据库(中国)》
隧道建设(中英文) ›› 2011, Vol. 31 ›› Issue (4): 416-425.
He Feng
何峰
摘要:
Based on the engineering practice of Beijing Railway Station - Beijing West Railway Station Underground Connecting Line and through comparison among different configurations of shield cutter head and cutters used under the sand-pebble condition, the adaptability of the cutter head and cutters of this project to strata before and after improvement has been studied in details, and moreover the following conclusions have been made according to analysis: (1) it is necessary to adopt disc cutters in configuration of the cutter head and cutters for compact sand-pebble stratum, and furthermore the disc cutter size as well as the cutter height difference between layer 1 and layer 2 should be increased whenever possible according to the pebble size and compactness to promote cutting penetration and tunneling efficiency; (2) effective cutting of the sand-pebble stratum can be achieved through logical configuration of cutters in different lengths such as disc cutters, splitters, and cutting bits, etc. (3) through optimization, the original connection mode of cutter, i.e. bolt connection is substituted by pin connection to prevent cutters from falling during tunneling and so on. The key problems that need attention in configuration of the cutter head and cutters under the sand-pebble condition have been solved, which can guarantee smooth implementation of the project and provide reference for other similar projects.