桃树坪隧道3号斜井进主洞施工技术

张学文1 , 王猛2, 赵旭鹏1   

  1. (1. 中铁十三局集团公司兰渝铁路工程指挥部, 甘肃 宕昌 748500; 2. 辽宁工程技术大学矿业学院, 辽宁 阜新 123000)
  • 收稿日期:2011-04-25 修回日期:2011-11-26 出版日期:2011-12-20 发布日期:2012-01-11
  • 作者简介:张学文(1977—),男,甘肃漳县人,2001年毕业于辽宁工程技术大学采矿工程专业,本科,工程师,主要从事工程管理和技术开发方面的研究工作。

Construction Technology for Connection Section between Inclined Shaft and Main Tunnel: Case Study on Taoshuping Tunnel

ZHANG Xuewen1, WANG Meng2 ,ZHAO Xupeng1   

  1. (1. LanzhouChongqing Railway Project Headquarters of China Railway 13th Bureau Group Co., Ltd., Dangchang 748500, Gansu, China; 2. Mining College, Liaoning Technical University, Fuxin 123000, Liaoning, China)
  • Received:2011-04-25 Revised:2011-11-26 Online:2011-12-20 Published:2012-01-11

摘要: 针对兰渝铁路桃树坪隧道3号斜井进主洞施工段施工难度大、工期紧和质量标准要求高等要求,结合工程地质特点,分别采取从斜井正交水平穿过正洞施工、交叉过渡段辅助导洞施工、正洞仰拱、二次衬砌施工、注浆及降水等施工方法,解决了斜井进主洞施工的技术难题,以期为同类工程的顺利完成提供理论基础和技术支持。

关键词: 兰渝铁路, 桃树坪隧道, 台阶法\双侧壁导坑法

Abstract: The construction of the connection section between No. 3 inclined shaft and main tunnel of Taoshuping tunnel on LanzhouChongqing railway has great construction difficulty, tight construction schedule and high quality requirement. Construction technologies, such as driving the inclined shaft perpendicularly to penetrate the main tunnel, pilot tunneling in the connection section, invert construction of main tunnel, secondary lining of main tunnel, grouting and dewatering are adopted on basis of the geological conditions. In the end, the problem of the construction of the connection section between the inclined shaft and the main tunnel has been successfully solved. The paper can provide theoretical basis and reference for the safe and rapid constriction of similar projects in the future.

Key words: LangzhouChongqing railway, Taoshuping tunnel, bench method, double side drift method