统包制度执行成效探讨——以台电地下电缆隧道高港二标为例

陈文欣1,李宗坤1,吴文隆2,陈聪海2   

  1. (1. 台湾电力公司输变电工程处南区施工处,高雄; 2. 台湾世曦工程顾问股份有限公司,台北)
  • 收稿日期:2011-04-15 修回日期:2011-04-25 出版日期:2011-08-05 发布日期:2011-11-04
  • 作者简介:陈文欣(1949—),1972年毕业于逢甲大学土木工程系,现任台湾电力公司南区施工处副处长,主管变电所、输电线路土建工程设计、施工。

Study on Executive Effectiveness of Turnkey System ——An Example of KaoKang Project

CHEN WenHsin1, LEE TzeonKuen1, WU WenLong2, CHEN TsungHai2   

  1. (1. Taiwan Power Company Transmission & Substation Projects Dpt.Southern Region Construction Office, Kaohsiung; 2. CECI Engineering Consultants,Inc., Taipei)
  • Received:2011-04-15 Revised:2011-04-25 Online:2011-08-05 Published:2011-11-04

摘要: 统包制度为结合设计与施工之发包方式,在台湾已逐渐被工程界采用,透过统包模式可有效整合设计与施工人才,减少界面协调的冗长程序,并可提早展开施工作业,缩短完工期程,是对业主、承包商均相当有利的制度。以台湾电力公司“高港-五甲-高雄345kV地下电缆线路凤林路段潜盾隧道统包工程(高港二标)”为例,探讨统包制度之执行成效,履约过程中为确保施工安全与达成业主要求,统包团队展现出设计与施工缜密完整的结合,除透过价值工程减省工程费及提升功能性外,统包团队依其施工能力、经验及技术,设计兼具安全性、施工性及经济性之作业方式,采用纤维筋(FRP)可切削工法顺利完成潜盾发进作业、利用钢环推进工法完成联络横坑施工、设计可挠伸缩接头衔接电缆隧道与分歧井有效解决应力集中及差异沉陷问题等施工困难案例。

关键词: 电缆隧道, 统包, 纤维筋, 可挠伸缩接头

Abstract: Turnkey system is an integral contracting means for the design and construction, and it has gradually been adopted in the engineering practice in Taiwan. Turnkey system can effectively integrate design and construction professionals and reduce the coordination of the long process of interface. Turnkey system would enable the construction work starting earlier and shorten the completion of working period. To the owners and contractors, turnkey system is very favorable. In this article, the project of KaoKang project has been depicted the executive effectiveness of turnkey systems in Tapower. To ensure construction safety and to achieve the requirements of owners in the course of execution of the contract, the performance of the turnkey team presents a perfect integration of design and construction. Except for reducing construction costs and enhancing the functionality by means of the value engineering assessment, the turnkey team, according to their ability, experience and technology, adopt the fiber reinforced plastics (FRP) construction method for successfully launching the cut operation of shield tunnel. The turnkey team also completed the cross adit construction by using steel ring jacking method, designed the flexible expansion joints connecting the cable tunnel and divert, and effectively solved the difficulities of stress concentration and differential settlement during the cable tunnel construction.

Key words: cable tunnel, turnkey, fiber reinforced plastics (FRP), flexible expansion joints