隧道建设(中英文) ›› 2014, Vol. 34 ›› Issue (1): 73-77.DOI: 10.3973/j.issn.1672-741X.2014.01.012

• 施工技术 • 上一篇    下一篇

南水北调穿黄隧洞有粘结环锚预应力施工重难点分析

孙振川, 仲生星   

  1. (中铁隧道股份有限公司, 河南 郑州 450003)
  • 收稿日期:2013-08-20 修回日期:2013-12-02 出版日期:2014-01-20 发布日期:2014-01-21
  • 作者简介:孙振川(1972—),男,陕西韩城人,1995年毕业于辽宁阜新矿业学院,采矿工程专业,硕士,教授级高级工程师,主要从事地下工程技术及管理工作。

Key Points in Implementation of Bonded Circumferential Prestressing of  Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project

SUN Zhenchuan, ZHONG Shengxing   

  1. (China Railway Tunnel Stock Co., Ltd., Zhengzhou 450003, Henan, China)
  • Received:2013-08-20 Revised:2013-12-02 Online:2014-01-20 Published:2014-01-21

摘要:

南水北调穿黄隧洞工程为我国首次采用盾构管片拼装式结构与衬砌预应力结构相结合的新型双层复合衬砌型式,隧洞内衬直径7 m,衬砌厚度45 cm,仅为直径的1/16,较常规混凝土偏薄,而且要承受单束锚索2 250 kN的张拉力,预应力偏高。为了解决薄壁混凝土环锚预应力施工中出现的锚具槽裂纹、钢绞线伸长值不足及预埋波纹管堵塞的难题,依托南水北调穿黄隧洞工程,采取理论分析计算、现场张拉试验等方法,探讨并解决了隧洞薄壁混凝土有粘结环锚预应力施工的技术难题,相关研究成果可供类似工程借鉴。

关键词: 南水北调, 穿黄隧洞, 有粘结环锚预应力, 裂纹, 锚索伸长值, 波纹管堵塞

Abstract:

Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project is the first tunnel in China where composite lining consisting of primary segment lining and prestressed insitucast reinforced concrete secondary lining is adopted. The diameter of the secondary lining of the tunnel is 7 m, while the thickness thereof is 45 cm, i.e., only 1/16 of the diameter thereof. Therefore, the prestressed insitucast reinforced concrete lining of the tunnel is thinner than that in normal cases. On the other hand, one single anchor cable of the prestressed insitucast reinforced concrete lining will undertake 2 250 kN tensioning force, i.e., the prestress is higher. Under these conditions, problems, such as cracks of the anchor tool channels, insufficient elongation of steel stands and jamming of embedded corrugated pipes, may occur. In the paper, solutions for these problems are studied by means of theoretical analysis and insitu tensioning tests. The paper can provide reference for similar projects in the future.